Overall plant layout and integration of the subsystems (in WP4)

Face-to-face meeting between KAEFER and Fraunhofer ISE was held on May 9, 2018 to discuss about
the specification and the operation conditions of the micro-gas turbine, the plant operating
strategies and the control system.